Posté le 18 FEBRUARY 2025 / 6
Catégorie : report / maintenance / Ascenseur moins 6 semaines
Secteur : Métallurgie - Sidérurgie
Nom du chargé de travaux : SOULAIMANA ABDOU
État / Statut : 🟢En service/Opérationnel

MAINTENANCE REPORT Nº120948

CHAUDIERE

Machinery access control (red key box, ladder, room closure, lighting, etc.)

Controlled elements: Revised Correct Control of buttons and displays (fct, luminous) R R

Landing door and cabin control (locking and closing contacts) R R

Precision stop and leveling control R R

Reopening device check (shock, cell, BP, etc.) R R

Cabin check (ground condition, trim, babbit, etc.) R R

Duct lighting control R R Power cut remote alarm control R R

Control of the current cut emergency operation R R

Cabin emergency lighting control, power off R R

Emergency lighting control of machinery, power cut R R

Date: 02/17/2025 Time Start 1:50 p.m. End Time 3:22 p.m.

Verification Telephone: Test Telephone: Observations Telephone: OBSERVATIONS lubrication of guides door checks level verification test

Caractéristiques
Pièces jointes
Event Details
Start Date:
17/02/2025
End Date:
17/02/2025
Start Time:
13:50
End Time:
15:22
Notes et commentaires
Il n’y a pas encore de note ni commentaire
Donner une note
Vous devez être pour noter et commenter
Numéro d"Ordre de Travail