MAINTENANCE REPORT Nº120948
CHAUDIERE
Machinery access control (red key box, ladder, room closure, lighting, etc.)
Controlled elements: Revised Correct Control of buttons and displays (fct, luminous) R R
Landing door and cabin control (locking and closing contacts) R R
Precision stop and leveling control R R
Reopening device check (shock, cell, BP, etc.) R R
Cabin check (ground condition, trim, babbit, etc.) R R
Duct lighting control R R Power cut remote alarm control R R
Control of the current cut emergency operation R R
Cabin emergency lighting control, power off R R
Emergency lighting control of machinery, power cut R R
Date: 02/17/2025 Time Start 1:50 p.m. End Time 3:22 p.m.
Verification Telephone: Test Telephone: Observations Telephone: OBSERVATIONS lubrication of guides door checks level verification test