TR: Intervention Report Nº 236479, ARCELOR MITTAL / PDC PCB2 AGGLO • Rapport_2026236479.pdf
Your browser cannot display the PDF.Download the PDF Report_2026236479.pdf INTERVENTION REPORT Nº 23647918 Bis Avenue de Bruxelles13127 VITROLLES 04 84 34 13 13CUSTOMER DATE: CONTRACT N° / TYPE02/07/2026…
Voir la publication
Aucune photo
TR: Intervention report • Rapport_2026231550.pdf
Your browser cannot display the PDF.Download the PDF Report_2026231550.pdf INTERVENTION REPORT Nº 23155018 Bis Avenue de Bruxelles13127 VITROLLES 04 84 34 13 13CUSTOMER DATE: CONTRACT N° / TYPE06/15/2026…
Voir la publication
Aucune photo
Pcb2
Cell not aligned when we arrived Beam adjustment and cell support Operation tests ok Return to service
Voir la publication
Aucune photo
pcb2
maintenance following breakdown check tension and condition of straps ok ground loop tests ok safety tests ok tube condition check ok tarpaulin condition check ok
Voir la publication
Aucune photo
pcb2
depending on our arrival operational tests security control verification of cell alignment and fixation returned to service
Voir la publication
Aucune photo
Pcb2
Curved tarpaulin traction tube triggering the sensor Put in manual mode while waiting for tube replacement
Voir la publication
PCB2 Automatic Door
Maintenance Cell test Try loop Try the probe 2 straps in 110 to replace
Voir la publication
Aucune photo
Pcb2
Placement of a collar on the spiral cord of the sensor in order to control its curvature when closing the door
Voir la publication
Aucune photo
Pcb2
Ground loop amplifier sensitivity adjustment Operation tests ok carried out with sector manager
Voir la publication
Aucune photo
Pcb2
Installation of flanges on feeler candles to limit unwanted movement during closing Probe always active Operation tests ok Safety tests ok
Voir la publication
Pcb2
False start during closing km1 and km2 contactor control terminal tightening check spiral cord retractable screen self test ok
Voir la publication
PCB2
Cleaning sensor cell tightening contactor terminal KM1 KM2 Recommissioning → Try → OK
Voir la publication
Aucune photo
PCB2 troubleshooting/administrative
Visual operational checks while waiting for the issuance of POS/AS No defects noted Departure at 10:20 a.m. due to non-delivery of necessary documents
Voir la publication
Aucune photo
PCB2 troubleshooting/administrative
Visual operational checks while waiting for the issuance of POS/AS No defects noted Departure at 10:20 a.m. due to non-delivery of necessary documents
Voir la publication