Intervention Report No. 210384, ARCELOR MITTAL / FINISSAGE F6B • Rapport_2026:210384.pdf
Your browser cannot display the PDF.Download the PDF Report_2026210384.pdf INTERVENTION REPORT Nº 21038418 Bis Avenue de Bruxelles13127 VITROLLES 04 84 34 13 13CUSTOMER DATE: CONTRACT N° / TYPE03/20/2026…
Voir la publication
Aucune photo
F6b
Arrived on site 7 tubes came out of the amount due to the violent wind Replaced the 7 tubes Do some testing -> OK
Voir la publication
Aucune photo
F6B
FDC control, due to random shutdown Temporary repair of the FDC, plan for replacement
Voir la publication
Aucune photo
F6B
When I arrived, the door was stuck open – Engine thermal fault, following an out of race – Replaced then tested -> OK
Voir la publication
Aucune photo
F6b
When I arrived, 4 tubes came out of the upright due to the violent winds Replace the tubes then leave the door blocked open
Voir la publication
Aucune photo
Aucune photo
Aucune photo
Aucune photo
F6B
When I arrived, the door was stuck open Faulty ground loop amplifier Do a reset Test → OK
Voir la publication
F6B
When I arrived, the door was stuck open -> Circuit breaker tripped -> Loop amplifier faulty -> Returned to service Conducted tests – OK
Voir la publication
Aucune photo
F6b
When I arrived, the door was stuck open -> Circuit breaker tripped -> Loop amplifier faulty -> Returned to service Conducted tests – OK
Voir la publication
Aucune photo
Aucune photo
F6B
Support Amount eaten away Significant vibrations during operation cause loss of cell beam Resumption Cell adjustment Plan to install a ground bracket for the upright
Voir la publication
F6b
maintenance Checking the straps Operation tests ok Safety tests ok Ground loop tests ok Two indicators to replace HS padlock on box
Voir la publication
F6b
Maintenance Operation tests ok Safety tests ok Ground loop tests ok Two indicators to replace Padlock on hs box
Voir la publication
F6b
Replacing the tubes behind the scenes Low tube straightening Return to service Plan to replace 6 tubes
Voir la publication
Intervention F6B
Following a strong gust of wind, the door fails. Stopping the door in the low lockout position of the equipment.
Voir la publication