Maintenance: Checks of safety organs Checking the correct operation of the device
Voir la publication
Aucune photo
AD17
Adaptation of a new FDC model Creating support Pulled new cables Setting the new FDC Tested – OK
Voir la publication
Aucune photo
AD17
Replacement of the strap attachment on the axle Quickly plan the replacement of the FDC Bas HS Deadman's door while waiting for FDC replacement
Voir la publication
Aucune photo
Ad17 Oct
Strap replacement Putting in dead man mode Taken side for end of race quote Operation tests ok Return to service
Voir la publication
Aucune photo
AD17 OCT
door has missed its limit switch 4 HS straps securing the door in the high position strap replacement quote in progress
Voir la publication
Aucune photo
AD17 OCT
maintenance visit tests functioning ok safety tests ok strap check ok test order ok
Voir la publication
Aucune photo
AD17
Modification of the location of the cells for better operation, offset by 30cm Low FDC setting
Voir la publication
Aucune photo
Ad17 Oct
Strap replacement Plan to move cells following poor condition of the tarpaulin
Voir la publication
Ad17 Oct
Maintenance Checking the straps Operation tests ok Safety tests ok Two hs indicators to replace
Voir la publication
Aucune photo
Ad17 Oct
Resumption of drum strap attachment Replacement of 4 straps Closing limit switch replacement Installation of a reducer on a tarpaulin at the limit switch level Operation tests ok…
Voir la publication
Aucune photo
Ad17 Oct
Return to service after drilling the coupling and installing 10 steel screws
Voir la publication
Aucune photo
Aucune photo
Ad17 Oct
Semi-annual maintenance Checking correct operation Checking tube status ok Checking strap condition ok Interior cell tests ok External cell tests ok
Voir la publication
Aucune photo
Ad17 Oct
Verification of opening and closing end of stroke ok Operation tests ok
Voir la publication
Aucune photo
Ad17 Oct
Door open upon arrival Need to record transfer trolley and nacelle for checking opening end of stroke
Voir la publication
Aucune photo
Ad17 Oct
Maintenance following return to service Opening tests ok Closing tests ok External cell tests ok Interior cell test ok TARP torn at the top Flashing hs
Voir la publication
Ad17 Oct
Return to service following replacement of tubes, straps, strap passes and closing limit switch Opening and closing tests ok Cell tests ok